4p, 60A Enclosed Insulated Crane Power Rail Conductor Bar System
Hanger can be front or side installation:A: Side installation,insert the tabs into the hanger body, position the hanger from the first end ofthe conductor rail moving to the corectposition.B: Front installation: lset into the hanger body from the top of the conductor railvia 45"angle, insert the tabs into the hanger body slot,whenremoval,take out the tabs by needle-nose pliers or a screwdriver first,then the hanger body can be removed from the conductor rail.
Installation of end tensioner,important notes of the installation ready to install,determine the running distance between two tight brackets as shown in figure.Tensioning bracket distance a-500mm,put the conductor rail right through the tensioner,screws and tighten it.After tensioners installed on the one end,hang the conductor rail on with a rope,and then pressed into the hanger and tighten.
The size of the tension is related to temperature, and its size should be guaranteed to absorb the change of the conductor rail lengthwhich leaded to when the temperature change. For conveniencen ofthe adjustment,should calculate to determine the length of thespring after compressing. a=140+16.6x10x(T+10)xL±15 mm T:environmental temperature when install,L:effective length of the conductor railm,effective length of the conductor rail: 1/2 of the total length,when install spring on the ends.
4p, 60A Enclosed Insulated Crane Power Rail Conductor Bar System
Hanger can be front or side installation:A: Side installation,insert the tabs into the hanger body, position the hanger from the first end ofthe conductor rail moving to the corectposition.B: Front installation: lset into the hanger body from the top of the conductor railvia 45"angle, insert the tabs into the hanger body slot,whenremoval,take out the tabs by needle-nose pliers or a screwdriver first,then the hanger body can be removed from the conductor rail.
Installation of end tensioner,important notes of the installation ready to install,determine the running distance between two tight brackets as shown in figure.Tensioning bracket distance a-500mm,put the conductor rail right through the tensioner,screws and tighten it.After tensioners installed on the one end,hang the conductor rail on with a rope,and then pressed into the hanger and tighten.
The size of the tension is related to temperature, and its size should be guaranteed to absorb the change of the conductor rail lengthwhich leaded to when the temperature change. For conveniencen ofthe adjustment,should calculate to determine the length of thespring after compressing. a=140+16.6x10x(T+10)xL±15 mm T:environmental temperature when install,L:effective length of the conductor railm,effective length of the conductor rail: 1/2 of the total length,when install spring on the ends.